To dry out a soggy side yard before winter, build a French drain in September or October: dig a trench that slopes to a safe outlet, line it with filter fabric, set perforated pipe in a bed of #57 stone, fill with more stone, and cap it with loam and seed. A 50 ft trench, 12" wide and 18" deep, takes about 3 cubic yards.

The narrow strip between a North Andover house and the lot line is often the wettest ground on the property. Much of town sits on dense glacial till with pockets of clay and ledge, so roof runoff and the neighbor's grade collect in that side yard and stay there. Whether you are near the Old Center or in a subdivision off Route 114, the result is a squishy path, a damp foundation, and mud that freezes into ruts.

Why build a French drain in North Andover this fall?

Trenching is easier before the wet weeks of late fall, and a drain installed now handles the freeze-thaw cycles and spring melt that make side yards worst. Our guide to fall base work before the wet season covers the same timing logic.

What stone should go in a French drain?

#57 Stone, roughly ¾" crushed granite, is the standard choice. It is clean drainage stone with no fines, so water moves through it freely. Avoid #610 or Dense Pack in a drain; they keep their fines so they compact, which is right under a driveway and wrong in a drain. Pea stone drains but is rounded and shifts more. Browse the full crushed stone collection for other sizes.

How much #57 stone does a French drain need?

Length × width in feet × depth in feet ÷ 27 = cubic yards. A small amount is displaced by the pipe; round up rather than down.

Trench length 12" wide × 18" deep 12" wide × 24" deep
25 ft about 1.4 yd about 1.9 yd
50 ft about 2.8 yd about 3.7 yd
100 ft about 5.6 yd about 7.4 yd

Stone weighs about 2,800 lb per yard and runs up to 6 cubic yards per load. A 100 ft trench at 24" deep is two loads, each with its own delivery fee. The landscape material calculator handles odd sizes.

How do you build a French drain, step by step?

  1. Plan the path and outlet. Find where water collects and pick a low, safe discharge point on your own property, such as a dry well area or a lower part of the yard. Do not send water onto a neighbor's lot. Check town rules before tying into anything.
  2. Call 811. Have utilities marked before digging. Side yards often hide gas, electric, and irrigation lines.
  3. Dig the trench. About 12" wide and 18–24" deep, sloping at least 1" for every 8 ft toward the outlet. Check the grade with a level and a string line.
  4. Line with filter fabric. Lay non-woven landscape fabric in the trench with enough extra on each side to fold over the top. It keeps silt from clogging the stone.
  5. Bed and lay the pipe. Add 2–3" of #57 stone, then lay 4" perforated pipe with the holes facing down.
  6. Fill with stone. Cover the pipe with #57 to within about 4–6" of the surface, then fold the fabric over the top.
  7. Cap it. Finish with stone for a visible drain path, or topsoil and seed for a lawn strip.

How do you finish the top of the drain?

For grass, cap the fabric with 4–6" of screened loam and seed it. A 50 ft trench 12" wide needs well under a yard at 4", so the 1 cubic yard minimum covers it with some left for low spots. Loam and stone are separate loads with separate delivery fees.

Can the truck reach a North Andover side yard?

Usually not directly. Drops are curbside or on the driveway by default (on-lawn by request with a waiver), and the truck needs about 13.5 ft of clearance and 10 ft of width and cannot dump over fences. Plan on a wheelbarrow. See our North Andover delivery page for area details; the fee for your ZIP appears at checkout. For soil drainage questions specific to your lot, UMass Extension is a good starting point.

North Andover French drain FAQ

Can I use sand instead of stone in the trench?

No. Sand packs and holds water. A French drain needs clean stone like #57 so water can move freely.

Do you deliver stone in late fall?

Yes. Deliveries run year-round.

Do you install drains?

No. Ottr delivers material only; the digging and installation are up to you or your contractor.