One cubic yard is the practical order for most brick walkway resets — a 1-inch setting bed over 100 sq ft takes just 0.31 yards, and our minimum order is 1 yard. The leftover isn't wasted: you'll want extra for sweeping into joints and for the sections you end up re-laying twice.
Walkway math at a 1-inch bed
| Walkway | Stone dust needed |
|---|---|
| 4 ft × 25 ft (100 sq ft) | 0.31 → order 1 yard |
| 4 ft × 50 ft (200 sq ft) | 0.62 → order 1 yard |
| 5 ft × 80 ft (400 sq ft) | 1.23 → order 1.5 yards |
Pull the bricks, screed fresh #10 Stone Dust at 1 inch, re-lay, and sweep more dust into the joints. Confirm your dimensions with the material calculator.