How much loam should I order for fall overseeding?

Plan on 1 to 1.5 cubic yards of loam per 1,000 sq ft for a fall overseeding topdress. That puts down a 1/4- to 1/2-inch layer — thick enough to level dips and bed the seed, thin enough that existing grass grows through. The math: sq ft x depth in inches ÷ 324 = cubic yards.

Topdress amounts at 1/4–1/2 inch

1,000 sq ft 1–1.5 cubic yards
2,500 sq ft 2.5–4 cubic yards
5,000 sq ft 4–8 cubic yards

New England's overseeding window is late August into September, and delivery slots tighten then — order in August so the pile is ready. Super Loam is the enriched topdressing pick; screened loam covers straightforward leveling. Check your area with the material calculator.