Plan on 1 to 1.5 cubic yards of loam per 1,000 sq ft for a fall overseeding topdress. That puts down a 1/4- to 1/2-inch layer — thick enough to level dips and bed the seed, thin enough that existing grass grows through. The math: sq ft x depth in inches ÷ 324 = cubic yards.
Topdress amounts at 1/4–1/2 inch
| 1,000 sq ft | 1–1.5 cubic yards |
| 2,500 sq ft | 2.5–4 cubic yards |
| 5,000 sq ft | 4–8 cubic yards |
New England's overseeding window is late August into September, and delivery slots tighten then — order in August so the pile is ready. Super Loam is the enriched topdressing pick; screened loam covers straightforward leveling. Check your area with the material calculator.

















